welcome,guest
TitleProduct

Hardened Pipe

  • Price:

    Negotiable

  • minimum:

  • Total supply:

  • Delivery term:

    The date of payment from buyers deliver within days

  • seat:

    Hebei

  • Validity to:

    Long-term effective

  • Last update:

    2021-02-11 08:51

  • Browse the number:

    438

Send an inquiries

Company Profile

HBYM GROUP

By certification [File Integrity]

Contact: xingwei2021(Mr.)  

Email:

Telephone:

Phone:

Area: Hebei

Address: Hebei

Website: http://www.pumpparts-hbym.com/ http://xingwei2021.0769rubber.com/

Product details

Concrete Pump Harden Pipe

Harden Pipe is made of special alloy steel ( 45Mn2). The inner pipe wall is case hardened by high-frequency induction hardening machine. The inner pipe wall becomes a wearable layer with high hardness. The service life of the inner-hardened concrete pump boom pipe is as 3 to 5 times as normal concrete pump pipe.

Heat treatment process: Case hardening by high-frequency induction quenching

Wall thickness of the pipe: 4.00mm, 4.50mm, 7.50mm

Hardness:

HRC58-HRC62 for inner quenching layer;

HRC35-HRC40 for transition layer;

HRC25-HRC30 for protective layer


Detail

Name

Size

Technology

Flange

Hardened Pipe

DN125*3M*4.5mm

Heat Treatment

Twin Layer

Hardened Pipe

DN125*3M*5.0mm

Heat Treatment

Twin Layer

Hardened Pipe

DN125*3M*8.0mm

Heat Treatment

Twin Layer

Besides we could also produce other sizes as customers' requirement.


Package

Plastic + Bundle Package


FAQ

Q: Are you trading company or manufacturer?

A: We are professional manufacturer specialized in Concrete Pump Spare Parts. And we trade our products with our clients directly.


Q: Can you do OEM and ODM?

A: Yes, OEM and ODM are both acceptable. The material, color, style can customize, the basic quantity we will advise after we discuss.


Q: Can we use our own logo?

A: Yes, we can print your logo according to your request.


Q: What's your MOQ?

A: If we have the products in stock, it will be no MOQ. If we need to produce, we can discuss the MOQ according to customer's exact situation.


Q: How long is your delivery time?

A: The general delivery time is 10~12 days after receiving your advance payment, if we have the goods in stock, it will only take 1~3 days.


Q: What is your term of payment?

A: 30% down payment before producing and 70% balance payment before shipping.


http://www.pumpparts-hbym.com/